Go to content

Building Life Cycle

Skip breadcrumb navigation Building Life Cycle Example
  • Improved Building life cycle through improved maintenance
    • Development of COBIE Data on new facilities
      • Construction Operations Building information exchange.
      • Scalable information exchange format for the life-cycle capture and delivery of information needed by facility managers.
    • Integration of COBIE data into Asset Works AIM system.
  • Building QA/QC inspections to identify O&M and deferred maintenance : generates work orders automatically on a periodic basis.
  • Buildings designed and constructed similar to the LEEDAP model : use Building Information Modeling (BIM) for better operations and maintenance.

BIM 3d model image